done:
radiator relocation...finally painted
tube repaired
head gaskets separated...bumped compresion up a bit
repaired tie rod
replaced speed sensor on gauge
replaced axles
adjusted spring rates on rear shocks
replaced left rear wheel bearings
lubricated front end suspension hiems
tightened all suspension bolts/nuts
drained counter balancer and tranny oil
Trailer modified to use ramp as extended deck
left:
install tube/wheel
install radiator/fluid
add tranny oil
add aux brake/tail lights to trailer
Then do as much of the same as I can on Ted's
left:
install tube/wheel - done
install radiator/fluid - done
add tranny oil - waiting on Amsoil order :twisted:
add aux brake/tail lights to trailer - done
Then do as much of the same as I can on Ted's
- setup front brakes....one hub is in BAD shape...sooooo
- finished a disc brake setup :shock:
need to install the disc brake setup...may swap complete - A-arms , spindles all at once, his A-arm bearings are worn too...Rocketman, you have any bushing sets on hand?
spare parts and requested parts set out including: 2 heads, 2 sets of rear shocks, one set of fronts, recoil starter, new clutches, puller tools....am I forgetting anything for anyone?
closer and closer to getting done...closer and closer to leaving
:shock: :lol: It's neck in neck!